Completion Date
1931
Project Type
Bridges
Location
Gold Beach, OR
42 25 40.5 N
124 24 47.5 W

The Rogue River Bridge, a seven-span arch bridge, was the first major structure in America to use the concept of the pre-stressed concrete arch.

IMAGE LEFT ALT TEXT  
Rogue River Bridge
The Rogue River Bridge was the most advanced concrete bridge in America when it was built. Distinguished bridge engineer Conde McCullough employed the techniques of Frenchman Eugene Freyssinet to create thin, graceful concrete arches for this seven-span structure.

 

Pre-compression of the concrete arch was achieved and, as a result of its success, pre-stressing became one of the hallmarks of American bridge building techniques.

Hydraulic jacks set at the crown of the arches were used to compensate for stresses induced by rib shortening, concrete shrinkage, temperature differentials, and movement of the fixed-end supports. These factors had previously been thought to limit the concrete arch to unyielding foundations, relatively short spans, or high rise-to-span ratios.